Filing in the Town of Brookhaven

The largest town on Long Island by area, where the building permit is often one of three or four approvals a project needs.

Map of Long Island with Suffolk County outlined

The Town of Brookhaven runs from the Long Island Sound to the Great South Bay and out onto Fire Island. It takes in hamlets as different as Stony Brook, Centereach, Coram, Medford, Shirley and Manorville, and that range is why two Brookhaven projects of the same size can need very different approvals.

Who has jurisdiction

Unincorporated areas file with the town’s Building Division at Town Hall in Farmingville, and zoning relief goes to the town’s Board of Zoning Appeals. The incorporated villages inside the town run their own building departments under their own codes: Belle Terre, Bellport, Lake Grove, Old Field, Patchogue, Poquott, Port Jefferson and Shoreham.

Postal addresses mislead here more than in most towns. Port Jefferson Station and East Patchogue, for example, are unincorporated hamlets that file with the town, while Port Jefferson and Patchogue are villages. The tax map settles it.

The approvals beyond the building permit

  • County sanitary review. Much of Brookhaven has no public sewer. Where a property is on a septic system, work that adds bedrooms or changes the use is reviewed by the Suffolk County Department of Health Services, on the county’s own timeline.
  • The Central Pine Barrens. A band across the middle and east of the town, including land around Manorville and Ridge, falls inside the Central Pine Barrens. Parcels in its core preservation and compatible growth areas carry clearing limits and, in some cases, a separate review.
  • Wetlands and the shoreline. Town and state wetlands rules can both apply along the south shore bays and the north shore harbors, and the Sound-front bluffs between Miller Place and Wading River raise erosion and setback questions.
  • Fire Island. Brookhaven’s Fire Island communities, including Cherry Grove, Fire Island Pines and Davis Park, add flood zone construction rules and the Fire Island National Seashore’s standards to the town’s own.

Which of these apply is checked against the maps at the start of a project. Finding one of them after the drawings are done is the most expensive way to learn about it.

What goes into a residential filing

The town’s current checklist governs, but a typical application for an addition, a dormer, a deck or a pool is built from the same parts:

  • The permit application and the owner’s authorization for whoever is filing.
  • A current survey, and a site plan drawn from it showing the proposed work, setbacks and lot coverage.
  • Construction drawings sealed by a New York licensed engineer or architect.
  • Energy code documentation for work that changes the building envelope.
  • Drainage for added roof and paved area, usually drywells sized to the town’s standard.
  • The sanitary approval, where the county is involved.
  • The contractor’s Suffolk County license and insurance certificates.

What tends to slow filings down

The department handles a very large number of applications, and an incomplete one is returned with objections rather than fixed over the phone. The recurring causes are:

  • A survey that is out of date or does not show everything on the lot.
  • Sheds, decks, pools or finished basements from earlier owners that were never permitted and now have to be legalized alongside the new work.
  • An open permit from years ago that was never closed out.
  • County sanitary review started late.
  • A variance that was not anticipated, because lot coverage or a setback was measured after the design was fixed.

Accessory apartments and rentals

An accessory apartment in Brookhaven needs its own town approval, separate from the building permit for the work, and rental properties are registered with the town. Both have their own applications and conditions, so they are confirmed before the drawings are prepared.

Before you start

Four checks decide most of the schedule: whether the property is in the town or a village, whether it is on sewer or septic, whether it falls inside the Pine Barrens or a wetland boundary, and what the building department’s file already shows for the address. All four can be answered before any design work is paid for.

Common questions

Is my property in the Town of Brookhaven or in a village?

Check the tax map or the tax bill rather than the mailing address. Belle Terre, Bellport, Lake Grove, Old Field, Patchogue, Poquott, Port Jefferson and Shoreham are villages with their own building departments. The rest of the town files with the Town of Brookhaven.

What is the Pine Barrens review?

Part of Brookhaven lies inside the Central Pine Barrens, a protected area with limits on clearing and development. Depending on where the parcel sits and what is proposed, a project there can need to meet those standards or obtain a separate approval in addition to the town permit.

Why does the county health department review an addition?

On properties with septic systems, adding bedrooms increases the design flow the system has to handle. The Suffolk County Department of Health Services reviews that, and its approval is usually needed before the town issues the permit.

Related services