Civil & Site Engineering

Site plans, grading, drainage and stormwater design for the ground a project sits on.

Illustration: a site plan with grading contours, drywells and a catch basin

What happens outside the building envelope decides approvals as often as what happens inside it. Civil engineering is the design of that ground: grading, drainage and stormwater engineered against the actual conditions of the site, which on Long Island frequently means working around a high water table.

Representative drawing work

When a project needs a civil engineer

A civil engineer is the design professional for the site rather than the building. On residential and small commercial lots across Nassau and Suffolk, that usually means one of these:

  • A new house, addition, pool or patio that adds roof or paved area and triggers the town’s drainage requirement.
  • A site plan for a building permit, a zoning board application or a commercial change of use.
  • Regrading a yard, or building on a sloping lot.
  • A retaining wall, a new driveway or a curb cut.
  • Water ponding against a foundation or running onto a neighboring lot.

Where the same project also needs structural design, the civil engineering and the structural engineering are prepared together, on one set of drawings. Where drainage or a wall has already failed, a forensic investigation establishes why before the repair is designed.

What the site plan has to show

The site plan is the drawing a department reviews for everything outside the building: property lines and setbacks, existing and proposed structures, lot coverage, driveways and parking, grading, drainage and utilities, and any slopes, trees or wetland boundaries that limit what can go where. It is built on a current survey — with elevations wherever grading or drainage is involved — and its numbers are the ones zoning is checked against.

Those numbers drive everything that follows. Coverage decides how much can be built, impervious area decides how much drainage is needed, and setbacks decide where it can go. Getting them right on the first submission avoids the most common round of objections.

Drainage on Long Island

Most Long Island towns and villages require new roofs and paving to drain into structures on the property — usually drywells sized to hold a set depth of rainfall from the area they serve. The required depth, the acceptable structures and the inspection steps differ from one department to the next, so the design starts from the rules of the department that will review it.

The limit is often the ground rather than the drywell. Near the South Shore, the bays and the harbors the water table can sit only a few feet below grade, and a drywell needs separation above groundwater to work. Where that separation is not there, the answer is shallower structures, more of them or a different approach — decided from test holes or borings, not assumed.

Grading, driveways and walls

Grading moves water away from the building and keeps it from running onto a neighbor’s lot. Driveway slopes and parking layouts are checked against the town’s standards, and a new or widened curb cut onto a town, county or state road is a separate permit from whoever owns the road. Retaining walls beyond a modest height, or walls holding up a driveway or a building, are engineered structures and are designed and detailed as such.

Who reviews it

On Long Island, the town or village building department reviews the site work with the permit, often together with its engineering or highway department; larger and commercial projects can also need site plan approval from a planning board. County agencies come in for septic systems, sewer connections and work on county roads, and the state DEC where a site is near wetlands or tidal waters, or where construction disturbs an acre or more. In New York City, site and drainage work is part of the Department of Buildings filing, and sewer and storm connections are approved by the Department of Environmental Protection.

What we need from you

A current survey, the proposed plans or a description of the project, and anything the department has already issued — a denial, an objection sheet or a list of requirements. If the survey is out of date or shows no elevations, a new one is usually the first step, and it tends to affect the schedule more than the design does. Once there is a usable survey the engineering is the shorter part of the process; review time is set by the department and varies widely between towns.

Scope

  • Site plans and zoning compliance analysis
  • Grading and earthwork design
  • Drainage and stormwater management
  • Groundwater separation analysis
  • Driveways, parking and loading layouts
  • Retaining walls and site structures
  • Erosion and sediment control

Who we work with

Developers, builders, pool contractors and owners undertaking site work.

Where we deliver this

Across Nassau, Suffolk, the East End and all five boroughs. Most requested in:

Related services

Related guides

Common questions

Why is drainage part of my building permit?

Because what you build changes where water goes. Most jurisdictions require stormwater to be managed on site rather than pushed to a neighbor.

What is groundwater separation?

The vertical distance between a structure and the water table. On much of Long Island it is close enough to drive design decisions.