Licensed Professional Engineering (646) 267-4827  ·  mfa@mfaengineering.com

Guide  ·  Reviewed

Filing in the Town of Hempstead

The largest town in the state, with its own building department and more than twenty villages that run theirs.

Map of Long Island with Nassau County outlined

The Town of Hempstead covers a large share of Nassau County and a wide range of housing, from older bungalows to new construction, much of it on the South Shore in mapped flood zones. Which department reviews a filing depends on exactly where the property sits.

Who has jurisdiction

Properties in the unincorporated hamlets file with the Town of Hempstead’s building department, and zoning relief goes to the town’s board of appeals. The town also contains more than twenty incorporated villages — and properties inside a village file with that village, under the village’s own code, not the town’s. Long Beach, though it sits beside the town, is a separate city. A mailing address does not always tell you which applies; the tax map does.

What a typical residential filing includes

  • The application forms and owner authorization.
  • A current survey showing the existing structures, and a plot plan showing the proposed work.
  • Drawings sealed by a licensed architect or engineer, prepared to the department’s format.
  • Energy code documentation where the work affects the building envelope or systems.
  • Drainage information where new roof or paved area is added.
  • Contractor licensing and insurance before the permit is issued.

Checklists change, and the department’s current list governs. The value of preparing the set for the specific department is that the common objections are answered before the examiner raises them.

What tends to slow filings down

  • Filing with the wrong department, or assuming the town’s rules apply inside a village.
  • Flood zone requirements on South Shore properties, including the substantial improvement threshold.
  • Unpermitted work or open permits from earlier owners.
  • Zoning relief that should have been identified before the plans were drawn.

Before you start

Pull the property file. The permit history, the certificate of occupancy and any open permits or violations decide what the new filing has to address — and an open item from years ago can hold up a new permit until it is resolved.

Common questions

Is my property in the town or a village?

Check the property’s tax map or tax bill. Many village properties share a postal name with a town hamlet, so the address alone can mislead.

Do villages accept the same drawings as the town?

The drawings are similar, but each village has its own forms, checklist and zoning, and its own board for relief.

Does a flood zone change what I file?

Yes. In a mapped flood zone the filing has to show compliance with the flood provisions, and larger projects can trigger the full flood requirements for the whole house.

Related services

More guides

Bring us the project.

Send the scope and you will get an approach, a timeline and a proposal.

Call