Construction Cost Estimating

Quantity takeoffs, budget estimates and independent review of contractor pricing.

Illustration: building materials with price tags and a budget estimate

Knowing what a project should cost is a different discipline from designing it, and it is the question owners are usually least equipped to answer alone. An independent estimate gives you a number to plan against and a basis for judging the numbers you are quoted.

Representative drawing work

What an estimate is built from

Early on, an estimate works from the scope, the floor area and the type of construction, priced at current costs for the area — enough to decide whether a project is worth pursuing, and at what size. Once there are drawings it becomes a quantity takeoff: the work measured from the plans and priced item by item, from foundations and framing through roofing, finishes, mechanical and electrical to site work. It also carries the costs that are easy to leave out — permits and fees, temporary work, protection, waste removal, the contractor’s general conditions, overhead and profit, and a contingency sized to how much is still unknown.

Every estimate is laid out so a lender, an insurer or a contractor can see how each number was reached, with its range shown alongside it.

Reading bids side by side

Three bids that are far apart are rarely three prices for the same job. One includes the demolition and another assumes the owner handles it; one carries an allowance for finishes and another prices a specific product; one leaves out the permit fees. Leveling sets every bid against the same scope, line by line, so the differences are visible and can be asked about before a contract is signed.

During construction

Once work starts, the estimate becomes the reference point. Change orders are checked against it — whether the extra work is really extra, and whether the price is in line — and a lender’s draw requests can be compared with the work actually in place, so payments follow progress instead of running ahead of it. For insurance claims, a repair estimate prices the documented damage so it can be set against the adjuster’s figure.

What we need, and how long it takes

Whatever exists: drawings at any stage, specifications or a finish list, the bids you have received, and the address, because location affects cost. A conceptual estimate can start from a scope description and photos; a detailed takeoff needs drawings. The time it takes depends on the size of the project and how complete the drawings are, and is agreed at the start — a budget figure for a single-family addition is a far quicker exercise than a full takeoff for a multi-unit building.

Scope

  • Conceptual and budget estimates at early design stage
  • Detailed quantity takeoffs from drawings
  • Independent review and leveling of contractor bids
  • Change order review and pricing analysis
  • Schedule of values review for lender draws
  • Repair cost estimates for insurance claims
  • Value engineering and cost alternatives
  • Budget tracking through construction

Who we work with

Owners, investors and developers pricing a project, lenders reviewing draw requests, and anyone holding a bid they are not sure how to read.

Where we deliver this

Across Nassau, Suffolk, the East End and all five boroughs. Most requested in:

Related services

Related guides

Common questions

Can you estimate before the drawings are finished?

Yes — a conceptual estimate works from scope and area rather than a full takeoff. It carries a wider range, and that range is stated rather than hidden.

I have three bids that are far apart. Can you tell me why?

Usually. Wide spreads normally mean the contractors priced different scopes, and leveling the bids against a common takeoff shows where they diverge.

Bring us the project.

Send the scope and you will get an approach, a timeline and a proposal.

Call